Portfolio Mondays · Stealable one-pager
Kill, Pause, or Fund Gate Card
Five questions, one page per item, so a gate can force a real kill, pause, or fund call after kickoff, not just before.
From Stage Gates That Can Actually Say No, a Portfolio Mondays episode on Portfolio Intelligence. Watch on YouTube
Item
1Is the value case still true? What changed since the last gate?
2What does this item depend on, and what depends on it?
Pull it from the portfolio dependency view. A green project with a red neighbor is still a portfolio problem.
| Direction | Provider | Consumer | Date needed | Owner | ConfidenceH / M / L |
|---|---|---|---|---|---|
| Inwhat it needs | |||||
| In | |||||
| Outwhat needs it | |||||
| Out |
3What capacity does it hold that something else is waiting for?
4What silent exceptions exist?
| Type | What moved | Was this decided?yes / no |
|---|---|---|
| Scope | ||
| Spend | ||
| Time |
If the answer is no, it is drift, not progress.
5Kill, pause, or fund? Pick one.
Stop, release the people onto named work, keep the lesson.
Freeze with a way back in.
Continue, and write down what this yes takes from something else.
No pass with conditions unless it has an owner and a date. Without both, it is a silent exception wearing a suit.
Worked example (fictional)
- Item
- Customer self-serve portal rebuild
- Sponsor / owner
- Customer support sponsor · Decision owner: portfolio lead
- 1. Value
- Original: cut support volume in half. Today: support volume barely moved, and features kept expanding.
| Direction | Provider | Consumer | Date needed | Owner | ConfidenceH / M / L |
|---|---|---|---|---|---|
| In | Identity platform team | Portal rebuild | Slipping | Rebuild lead | Low |
| Out | Portal rebuild (shared auth pattern) | Partner API gateway cutover | Waiting | Gateway lead | Low |
- 3. Capacity held
- Two platform engineers. The patch window and the gateway both need them.
- 4. Silent exceptions
- Scope grew twice with no new sponsor yes (decided: no). Spend ran past the last funded envelope (no). Time slipped three months (no).
- 5. Honest calls
- Pause: restart trigger is a rewritten value case; restart review in six weeks. Or Kill: release the two engineers to the patch window and capture the lesson. Fund works only if it names what the gateway and the patch window lose. No free yes.
The card does not pick for you. The sponsors and the portfolio lead make the call in the open, then log it with an owner and the next gate date.
Optional: let AI draft the pack
Paste this with your updates. AI assembles the evidence. Only people can say no.
Help me prepare a Kill, Pause, or Fund Gate Card for [item name]. From the status updates, RAID entries, dependency view, and plan pasted below, draft: 1. The original value case and today's value case, one line each, and what changed. 2. Dependencies in and out: provider, consumer, date needed, owner, confidence, exactly as the sources state them. 3. The capacity this item holds and who is waiting on it. 4. Candidate silent exceptions where scope, spend, or time moved with no logged decision. 5. Any sunk cost language (keep going because we already spent). Quote the source line for each claim. Mark anything missing as "needs a human." Do not recommend kill, pause, or fund. Do not assign owners or set confidence. [paste updates here]
Kill, Pause, or Fund Gate Card · scottpresley.net/tools/gate-card · Portfolio Mondays on Portfolio Intelligence · AI drafts. Humans decide.